Starting configuration for routine handling.

CUSTOMIZATION
Start with the load. Build from there.
Tell us what you move, how high it must go and where the forklift will work. We will check the truck, mast and attachment as one configuration.

Attachment capability overview · final fitment and remaining capacity require engineering confirmation.
MAST HEIGHT PATH
Required lift height is only half the question.
Closed mast height, overhead clearance, load centre and usable capacity at height must be reviewed together. The bars compare requested height paths; they are not a load chart.
Start a high-rack brief →Confirm closed mast height and load at height.
Residual capacity becomes a more important check.
Confirm model, stability and doorway limits.
Engineering review required before quotation.
BATTERY DIRECTION
Choose around the working day.
Flexible charging path
- Useful where opportunity charging is available
- Lower routine battery maintenance
- Confirm daily hours, charger and transport rules
Initial-cost path
- Familiar and practical for many standard operations
- Requires charging time and battery maintenance planning
- Confirm capacity, charger and shift pattern
HOW A CUSTOM PROJECT STARTS
Four pieces of information are enough for the first discussion.
- 01Load
Material type, weight, dimensions and current handling method.
- 02Height
Required lifting height and any doorway or ceiling limits.
- 03Site
Indoor, outdoor, floor condition, slope and working space.
- 04Usage
Daily working hours, charging conditions and expected quantity.
HAVE A NON-STANDARD JOB?
